Levey–Jennings Charts and Westgard Rules, Explained

Learn how to read Levey–Jennings charts, interpret common Westgard QC signals, and investigate out-of-control results responsibly.

Share this article
Laboratory quality-control charts displayed beside reagent bottles and a pipette
Editorial illustration · not an actual LabProton application screenshot

Internal quality control helps a laboratory detect changes in an analytical method before unreliable patient results are released. A Levey–Jennings chart is a useful way to see those changes. It plots control results over time against an established mean and standard-deviation limits. Westgard multi-rules are one possible statistical decision procedure for interpreting the points—not a universal set that every assay must apply in exactly the same way.

The useful question is not 'Did the software turn the point red?' It is 'Does our validated QC procedure show that this method is performing acceptably for the results we intend to report?'

Read the chart before choosing rules

For each control level, define the assigned or laboratory-established mean and standard deviation using an appropriate, documented process. Manufacturer target ranges can help during setup, but package-insert limits are not automatically a substitute for laboratory verification or locally suitable QC limits.

Plot results in chronological order with the mean at the center, then lines at +1, +2 and +3 SD and their negative equivalents. A result slightly above the mean is not an error by itself. Look for large deviations, sustained shifts, trends, and differences between levels.

There is no one-size-fits-all rule that every laboratory must run a control exactly twenty times over twenty days before using a chart. Select a setup and verification approach consistent with applicable quality requirements, available precision data, and the laboratory's QC plan.

Understand common multi-rule signals

The notation names the pattern being evaluated. In one commonly taught Westgard multirule procedure (with the sequence and decision logic specified in advance):

  • 1-2s: one observation beyond ±2 SD; often a warning or trigger for further evaluation, not necessarily an automatic rejection.
  • 1-3s: one observation beyond ±3 SD; commonly a rejection signal.
  • 2-2s: two related consecutive observations beyond 2 SD on the same side of the mean; commonly suggests a shift.
  • R-4s: a difference greater than 4 SD between appropriate control observations, typically assessed within a run, may indicate random error.
  • 4-1s: four relevant consecutive control observations beyond the same +1 SD or −1 SD boundary, as defined for the control series; this may signal a systematic change.
  • 10x: ten relevant consecutive control observations on the same side of the mean; also suggests a possible shift.

Rules involving consecutive observations depend on whether the QC design evaluates one level or combines levels, and exactly what constitutes a run.

These are interpretation examples, not instructions to copy blindly. Definitions, run structure, number of levels, and whether a pattern triggers warning or rejection must be specified in the laboratory's chosen QC plan. A 10x pattern does not automatically mean 'recalibrate'; the correct action depends on investigation.

Synthetic Levey–Jennings chart showing a control mean, plus and minus three standard deviations, and two consecutive observations beyond plus two SD.
Illustrative graphic · values and symbols are examples, not patient results or validated QC reference data

Choose QC rules to fit the method

A high-performing method with a low risk of clinically important error may need a different QC design from a method operating close to its allowable error limits. Consider assay precision, bias, expected clinical use, number and concentration of control levels, run size, and local or regulatory requirements.

Rules that are too sensitive create repeated false rejections and wasted material. Rules that are too permissive may fail to detect important errors. Before changing limits or applying a new multirule scheme, document the reason and verify how the change behaves with representative data.

What to do when QC is out of control

Do not release potentially affected patient results according to the laboratory's hold and review policy. Look for obvious causes: wrong control lot, expired or poorly mixed material, recent calibration or maintenance, environmental changes, reagent condition, instrument flags, or transcription errors. Repeating the control without investigating can produce a convenient passing value while hiding a real problem.

Record the rejected run, tests affected, investigation, corrective action, and evidence that acceptable performance was restored. Assess whether patient results generated since the last acceptable QC need review or correction. Recalibrate only when appropriate to the identified problem and manufacturer's validated procedure.

Example: a cluster of QC points on one side of the mean

Imagine a control that historically centers near its approved target. Over several runs, its results begin appearing consistently above that mean. No single point is dramatically high, but the sequence may violate a shift rule under the laboratory's selected QC strategy. That does not prove which component is responsible. The right next step is to review control preparation and lot, recent calibration, reagent changes, maintenance, and the pattern at other control levels.

An investigation may find that a new reagent lot was introduced before the shift began. Staff should assess whether the change explains the observed pattern and whether method-specific action or verification is needed. If a rejection condition has been met, reporting of affected patient results follows the laboratory's hold and review policy until performance is acceptable again. Documenting the sequence is more useful than repeatedly rerunning the vial until a green mark appears.

Avoid: interpreting one 2-SD warning as automatic failure in every system, treating all runs of ten results on one side as an order to recalibrate, or using manufacturer ranges without an appropriate local QC plan. Rule interpretation needs context.

Common questions

Does a 1-2s warning automatically stop patient reporting?

Not in every multi-rule design. In many commonly taught procedures 1-2s is a warning, and other rules guide rejection. The laboratory must define the actual rule set and action plan for its method.

Should I recalibrate every time a control fails?

No. Investigate control preparation, lot changes, reagents, maintenance, and instrument conditions first. Recalibration is appropriate when evidence supports it under the method procedure, not simply because a chart contains a red point.

Reference leads

Westgard JO and colleagues, 'A multi-rule Shewhart chart for quality control in clinical chemistry,' *Clinical Chemistry* (1981); CLSI C24 guidance on statistical QC; current assay instructions.